Can we discuss both trades in the same quote request?
Yes. Send the electrical and air conditioning requirements together, including current plans, equipment selections and the project stage. We clarify the work we can include and identify interfaces with other contractors. Combining the conversation does not mean every project service is automatically included.
Can you quote from plans before the site is ready?
Plans are a useful starting point. Include their revision, specifications, site suburb and requested timing. We confirm whether that information is sufficient for a quote or whether existing supply, access or installation conditions need assessment. Open selections and assumptions should be identified before a price is agreed.
What if the drawings or equipment selections change?
Send the revised information and identify what has changed before the affected work proceeds. A change can alter routes, circuit requirements, equipment space, price or sequencing. The responsible contact needs to approve any revised scope and timing.
Can you work to our construction programme?
Share the proposed stages, required dates and dependencies as early as possible. Availability, equipment lead times, site readiness and the agreed scope need to be checked before dates are confirmed. A requested date or enquiry is not a reserved installation slot.