Malaga-based · servicing Perth
EC14280 · GF20805 · AU066760
Mon–Fri · 8:00–4:000491 460 301
Get a quote

Perth electrical & aircon help

How long does an EV charger installation take?

Quick answer

A straightforward home EV charger installation, where the switchboard already has capacity, usually takes half a day. If the switchboard needs upgrading to support the dedicated circuit, expect a full day or a separate follow-up visit, since the board work is typically assessed and quoted first.

What determines the timeline

  • Switchboard capacity: the main variable. If there’s spare capacity, the dedicated circuit and charger go in the same visit.
  • Cable run length: a charger near the switchboard is quicker than one at the far end of a garage or carport.
  • Charger type: most home units install similarly, but some models have extra commissioning steps.

Typical process

We assess the switchboard and available capacity first, then quote the dedicated circuit and any board upgrade needed, before installing and testing the charger to Australian standards.

Last updated 14 July 2026

Published by Neighbourhood Electrical & Air · Editorial process and corrections

Perth · Licensed · Family-owned

Need it sorted?

Get the scope and next practical step confirmed before work starts.